Environmental Background
AGES was contracted to perform remediation design and construction oversight of a PCB impacted building demolition project at an industrial facility in Central Ohio. The painted superstructure, equipment and concrete floors were sampled by AGES to determine the extent and concentration of PCB impacts.
PCB Remediation Work
The concrete floors were scabbled using state of the art remote controlled dustless decontamination equipment operated by experienced contractors. Remediation, instead of replacement, of concrete floor allowed for reuse of the concrete slab for future building construction. The reuse of the concrete slab reduced both the disposal and future construction costs.