Demolition Project Work
AGES was contracted to perform remediation design and construction oversight of a PCB impacted building demolition project at an industrial facility in West Virginia. The painted walls, superstructure, equipment and concrete floors were sampled by AGES to determine the extent and concentration of PCB impacts. This data was used to support a waste profile (including TSCA regulated waste, hazardous, and non-hazardous) and update the corporate cost model for the project. Waste streams from the demolition of the building and equipment were segregated and shipped off-site in a timely manner following all applicable state and federal requirements.
The building was safely demolished on schedule, within budget and to the client’s satisfaction.